|
ASHRAE Technical Committee 6.1 - Hydronic & Steam Heating Equipment & Systems
Research
Active Research Projects RP-1196 Development of software to calculate the application seasonal efficiency of commercial space heating boiler systems based on ASHRAE Standard 115P
Previously Completed Research Projects
Click on the project number to be redirected to the publications store where you can purchase the final report.
RP-1193 Develop design data on PVC plastic pipe fittings; sizes 6", 8", and 10" diameters. (TC8.10)
RP-1116 Develop design data on pressure loss of 6", 8", and 10" pipe fittings. (TC8.10)
RP-1090 Development of a two-dimensional transient model of snow-melting systems and use of a model for analysis of design alternatives.
RP-1035 Develop design data on the pressure loss of closely spaced multiple fittings.
RP-1034 Develop design data on the pressure loss of large pipe fittings.
RP-968 Validation of design data on loss coefficients of constant diameter pipe fittings and pressure loss of pipe fitings and development of design data on pressure loss coefficients of reducing pipe fittings (TC8.10).
|